Beginning Monday, Nov. 1, Cameron Street between Waterloo Street and Bernard Street will be closed to through traffic.

The work is expected to last five days and is a result of repairs of the railway crossing. The work could take longer depending on weather conditions and other factors.

While the road will be closed to through traffic, local traffic is being permitted. Motorists are being asked to avoid the area if possible during the construction period.

The public is reminded to drive with caution will traversing the construction zone, and follow all signage and worker directions.